ALGERIA · NORTH AFRICA[email protected] →
NTCSOSWELL INTEGRITY & TECHNOLOGY
ENGINEERING · FIELD SERVICES · DIGITAL SOLUTIONS

SPECIALIST WELL INTEGRITY / KCI TECHNOLOGY

Target the leak.
Review the possibilities.

Engineered sealant solutions for selected well integrity challenges, supported by technical candidate review.

SEALANT
REPAIR
APPLICATION-LED ENGINEERING

THE APPLICATION

A repair starts with
understanding the leak.

NTCSOS coordinates your requirements
and the review of a suitable technical approach.

KCI develops engineered leak-sealing and isolation solutions for oil and gas assets.

Its IG-FP technology addresses selected DHSV hydraulic control-line fitting leaks. The non-curing gel is intended to isolate a leak path while allowing the control fluid to operate the valve.

It is designed for fitting leaks, rather than holes or splits in the control-line tubing. Compatibility, leak behaviour and valve response require review before any treatment is selected.

KCI offshore equipment and operational setting
Image: KCI Ltd. Technology and application details are reviewed with KCI.
01 / CONTROL LINES

DHSV control-line leak repair

Review fitting leaks and the suitability of IG-FP for the control fluid and valve configuration.

02 / WELLHEADS

Wellhead seal isolation

Assess leakage around hanger seals and the potential for an engineered sealant approach. KCI directs current enquiries to MS-Sealant following discontinuation of Mac-Seal.

03 / VALVES

Selected gate-valve applications

KCI’s Mac-Pac is a non-curing sealant and lubricant for selected isolation applications. Suitability depends on the valve and the intervention objective.

SEE THE PRINCIPLE

Control-line repair,
explained visually.

Official KCI animation.
Illustrative technology overview.

Video: KCI Ltd. Playing loads YouTube’s privacy-enhanced player. Open the original video →

PREPARING A REVIEW

Bring the right information.
Define the next step.

Start with available drawings, leak history and test records. NTCSOS will coordinate the information required for a technical discussion.

Request a candidate review →
01

Describe the issue

Well configuration, suspected leak location and operational impact.

02

Share the evidence

Fluid details, pressure history, valve information and previous repair attempts.

03

Agree the approach

Technical suitability, proposed scope and acceptance criteria before execution.

TECHNOLOGY REFERENCES

Technology information and media are credited to KCI Ltd. This page is an overview; a well-specific engineering assessment is required.